Danny_Blade
Active Member
In the article on the OS it says:
"The existing Cherry Street car park area (which currently has 310 spaces) will be replaced by a slightly smaller number of spaces spread between ground and basement level car parks, approximately 250 car parking spaces over two levels."
Where would this basement level car park they speak of be built? Do they really mean they're going to have to dig underground (probably underneath the current one?) to have a two level car park?
EDIT: I'm also guessing this second car park will also be used for the people that will be living in the new residential building that will be above the new club shop?
"The existing Cherry Street car park area (which currently has 310 spaces) will be replaced by a slightly smaller number of spaces spread between ground and basement level car parks, approximately 250 car parking spaces over two levels."
Where would this basement level car park they speak of be built? Do they really mean they're going to have to dig underground (probably underneath the current one?) to have a two level car park?
EDIT: I'm also guessing this second car park will also be used for the people that will be living in the new residential building that will be above the new club shop?