The club do have to conduct inspections of the stadium structure at least once every 12 months and report to the Council as part of the requirements for our annual safety certificate, and it’ll be likely this regular process that flagged the issue. If that occurred at the end of last season, it might not have been as simple to get it all done in the summer – if as Bettis suggested it’s a sizeable bit of work, and not a simple job, that might not have been easily scheduled in with the contractor – I’m speculating here, but I know from something simple enough in comparison like installing the rails for the safe standing that this needed a good few months lead in time.
There is mention of the works in this season’s safety certificate (“remedial works to the Bramall Lane Stand roof and truss”) and that there is an agreed schedule for the works. Nothing about any imposed restriction on the area capacity is mentioned, other than the Council reserving the right to close it if it’s deemed unsafe, but it might be that the club has taken that independently based on the structural engineers’ advice.
I hope it’s back to being fully open again soon, as it’s a sad sight to see it empty.
View attachment 245424