Sheffsteel
Well-Known Member
- Joined
- Jul 18, 2015
- Messages
- 13,506
- Reaction score
- 28,171
I would have thought that the expansion will take place then.
Makes sense....but increasing the capacity of the Kop next season is major news....it’s a big positive.
So you would have thought the club would have communicated this..
Also I’m certain McCabe said the Kop expansion designs would take 1 season + 1 Summer to build (14 months).
He said the beauty of the design was building behimd the Kop....meant only a minimal reduction in capacity was required.
He said the big work of extending and re-positioning the roof woukd be done over the Summer...once the stand is built.