If the problem is rake, leg room, pillars and facilities on the kop, and realistically the earth mound can't be moved, how about this (String, turn your eyes away now):
Why don't we build over the existing structure, remove the current concrete terrace and build a new structure on steel frame at a sensible rake and with better leg room. AND extend at the back to increase capacity and improve the facilities.
I'm no architect mind......
Sounds a decent idea but extending further back gives us 3K more seats.
Creating more leg room loses 1.5K of those seats. So your idea is to increase the building costs and with a capacity increase to only 1.5K it will take much much longer to see a return on the investemenf.
Looking at the business plan It’s a non starter.