Ned the Donkey
Along for the Ride
- Joined
- Aug 25, 2018
- Messages
- 564
- Reaction score
- 1,376
It looks like they're resurfacing around the top end of Wolseley Road. Whatever it is it's a big job.
Down to one lane. Temporary traffic lights. It's already backing up a long way.
Maybe it'll all be free and clear before kick off but it doesn't look like it.
Might be an idea to set off very early/avoid/walk/cycle/helicopter/Star Trek transporter beam.
Down to one lane. Temporary traffic lights. It's already backing up a long way.
Maybe it'll all be free and clear before kick off but it doesn't look like it.
Might be an idea to set off very early/avoid/walk/cycle/helicopter/Star Trek transporter beam.